Required components and accessories checklist – Amtrol TD-7ZDW User Manual

Page 5

Advertising
background image

-5-

TD-7Z, TD-41Z, TD-7ZDW, TD-41ZDW

COMPONENTS CHECKLIST

The following is a checklist of components required for proper installation of these

BOILER MATE™ models, both Priority and Non-Priority:

A. Separate circulator

• 1 each - circulator (4-8 gpm)
• 1 each - positive shut-off weighted check valve

B. Use of heating system zone circulator

• 1 each - zone valve

C. Also Required:

• 4 each - unions
• 4 each - shut off valve
• 1 each - vacuum breaker
• 1 each - T & P relief valve (included)
• 1 each - A THERM-X-TROL

®

expansion tank - REQUIRED IF a Back flow preventer, check

valve or pressure reducing valve is installed anywhere between the BOILER MATE™ and
the city main.

• As needed - pipe dope or Teflon tape
• Do not forget an EXTROL

®

and thermal expansion - an expansion tank is required on the boiler

side of your system.

If a steel hydropneumatic tank is in place, AMTROL recommends
replacing it with a properly sized EXTROL

®

expansion tank. Otherwise,

significant heat transfer problems can occur by causing air to be trapped in the heat
exchanger. If the boiler system has an EXTROL

®

expansion tank and the boiler

temperatures are being changed, resize the EXTROL

®

expansion tank.

3. REQUIRED COMPONENTS AND

ACCESSORIES CHECKLIST

Advertising
This manual is related to the following products: