Installing azek resurfacing bullnose pavers, Resurfacing bullnose pavers, Page 2 – AZEK Bullnose Paver & Transition Paver User Manual

Page 2

Advertising
background image

Page 2

Installing AZEK Resurfacing Bullnose Pavers

LEAVE 6.5"-7" OF

GRID REMAINING

4X8 PAVERS IN

DESIRED PATTERN

SUB-STRUCTURE

BULLNOSE PAVER

GRID

APPLY ADHESIVE

SCREW TABS

BULLNOSE PAVER TO BE FULLY

SUPPORTED BY SUB-STRUCTURE

BULLNOSE PAVER

SUB-STRUCTURE

GRID

LEAVE 6.5"-7" OF

GRID REMAINING

LEAVE 6.5"-7" OF

GRID REMAINING

45°

SUB-STRUCTURE

BULLNOSE PAVER

4X8 PAVERS IN

DESIRED PATTERN

SCREW TAB

APPLY ADHESIVE

GRID

CUT BULLNOSE

PAVER 1 AS SHOWN

CUT BULLNOSE

PAVER 2 AS SHOWN

CUT BULLNOSE PAVER 4 AS SHOWN

CUT BULLNOSE PAVER 3 AS SHOWN

BULLNOSE PAVER TO BE FULLY

SUPPORTED BY SUB-STRUCTURE

BULLNOSE PAVER

SUB-STRUCTURE

GRID

Resurfacing Bullnose Pavers

LEAVE 6.5"-7" OF

GRID REMAINING

4X8 PAVERS IN

DESIRED PATTERN

SUB-STRUCTURE

BULLNOSE PAVER

GRID

APPLY ADHESIVE

SCREW TABS

BULLNOSE PAVER TO BE FULLY

SUPPORTED BY SUB-STRUCTURE

BULLNOSE PAVER

SUB-STRUCTURE

GRID

LEAVE 6.5"-7" OF

GRID REMAINING

LEAVE 6.5"-7" OF

GRID REMAINING

45°

SUB-STRUCTURE

BULLNOSE PAVER

4X8 PAVERS IN

DESIRED PATTERN

SCREW TAB

APPLY ADHESIVE

GRID

CUT BULLNOSE

PAVER 1 AS SHOWN

CUT BULLNOSE

PAVER 2 AS SHOWN

CUT BULLNOSE PAVER 4 AS SHOWN

CUT BULLNOSE PAVER 3 AS SHOWN

BULLNOSE PAVER TO BE FULLY

SUPPORTED BY SUB-STRUCTURE

BULLNOSE PAVER

SUB-STRUCTURE

GRID

Resurfacing Bullnose Pavers

• Cut Grid to allow for adequate interaction
of Grid and Paver and so the bottom of the
Bullnose Paver is fully supported.

• Choose a starting point based on the dimensions of the project and the desired pattern.

• Fasten Grids on stair treads using 1.5" screws.

• Do not fasten grids on deck or flat roof surfaces.

• Apply 1/4" bead of adhesive to the top ribs of the Grid.
(Titebond PROvantage Landscape Adhesive is recommended).

• Place Bullnose Paver onto the Grid, pressing firmly.

• Screw down the visible tabs into the Grid.

• Do not screw into deck boards except on stairs.

Screws are not recommended on flat roof applications.

• Slide adjacent Bullnose Pavers into place until finished.
(May need to cut off exterior tabs)

• Let cure for a minimum of 72 hours.

Corner Assembly

Advertising