2 installation, 1 space requirements, 2 installation process – Beijer Electronics EXTER K30m EN User Manual

Page 9: 1 space requirements 2.2 installation process, 2installation

Advertising
background image

Installation

Beijer Electronics, MAEN810C

9

2

Installation

2.1 Space Requirements

– Installation plate thickness: 1.5 - 7.5 mm (0.06 - 0.3 inch)
– Space requirements when installing the operator panel:

Caution

The openings on the enclosure are for air convection. Do not cover these

openings.

2.2 Installation Process

1. Unpack and check the delivery. If damage is found, notify the supplier

.

Note:

Place the operator panel on a stable surface during installation.

Dropping it or letting it fall may cause damage.

2. Place the panel cut out where the operator panel is to be situated, draw along the

outer sides of the holes and cut according to the markings. If access to the text
strips is needed, add extra space at the left side.

187 mm

57 mm

100 mm

(4.0 inch)

50 mm

(2.0 inch)

50 mm

(2.0 inch)

100 mm

(4.0 inch)

(7.36 inch)

202 mm

100 mm

(4.0 inch)

(7.95 inch)

(2.24 inch)

x 7

Panel cut out 166 x 149 mm

(6.54 x 5.87 inch)

For text strip

7.0 mm

14.0 mm

(0.55 inch)

(0.28 inch)

Advertising