Smb 600 series -ce models with safety pilot, Initial set-up – Magikitch'n FM User Manual

Page 20

Advertising
background image

SMB 600 Series -CE Models with safety pilot

2. INITIAL SET-UP
SMB 600 Series-CE models

COAL SUPPORT - The coal support must be installed so that it is pushed against the back wall
of the unit. This creates an air gap over the runner tube to allow proper ventilation.














COALS - Use only Magicoals supplied by MagiKitch’n. Do not use lava rock or other replacement
coals. They do not perform as well or last as long as the Magicoals that were designed for this
application. Place the coals evenly across the surface of the coal support. Do not pile them up.
This will cause excessive flare up, reduce ventilation, and cause overheating of the valves and
other components.














PREHEATING - It is necessary to preheat a cold broiler each time before cooking. The recommended time is 15-20 minutes for
coal style charbroilers, at which time the cooking grid should be hot enough to cook on without sticking, and will produce the
proper searing effect.

31-01-12962 rev B L25-004 rev

1 (05/11)

16

Advertising
This manual is related to the following products:

CM, APM, APL