Charbroiler assembly and installation – Magikitch'n LPCGA User Manual

Page 6

Advertising
background image

2. CHARBROILER ASSEMBLY and INSTALLATION

These unassembled parts should be included in your charbroiler package (Figure 1):

Item Number

Description

1

Cooking Grid (s)

2

Radiants

6

Frame Assembly

8

Runner Tube Cover(s)

9

Water Tub(s)

10

Base

25

Leg & Swivel Lock Caster Assemblies


Assembly Instructions for the Unit

(refer to Figures 1 & 10, and Table 1)

1.

Remove shipping bands from carton.

2.

Remove top of carton.

3.

Remove cooking grids(s), (1) from unit and set aside.

4.

Remove and unwrap any small parts packages that are located inside beneath the cooking grid. NOTE:

Parts made of stainless steel may be coated with a protective plastic film that must be removed before
firing.

5.

Lift frame assembly (6) from carton and set aside.

6.

Lift water tub(s) (9) from carton and set aside.

7.

Lift base (10) from carton and place upside down on ground.

8.

To install the leg & caster assemblies, insert the assemblies (24) into the leg sockets on the base (10)

and depress “snap button” on leg. The leg will slide into the socket and will lock into the correct location.

9.

Flip the base over, with the leg & caster assemblies installed, into the upright position. The long hooks for

the tank cart are on the front of the base, the short ones on the rear. Place the frame assembly (6) on
base (10) with the shelf support brackets located in the notches on the front base assembly.

10. Place runner tube cover(s) (8) on their brackets to cover the runner tube(s).

11. Place the radiants (2) on their front and rear support pins over each burner.

12. Slide water tub(s) (9) into frame assembly (6).

13. Place cooking grid(s) (1) into frame assembly (6).


Assembly Instructions for the Tank Cart

1. Open the tank cart hardware package and remove the instruction sheet.
2. Thread the hex nuts onto the eyebolts as far as they will go. Place a flat washer on each one.
3. Install an eyebolt assembly into each of the four holes in the upper corners of tank cart.
4. Install another flat washer and an acorn nut over the end of each eyebolts. Align the eyebolts perpendicular

to the cart sides (Figures 11 on page 12) and tighten them with wrenches.

31-01-09819 L25-005 Rev

2 (05/11)

4

Advertising
This manual is related to the following products: