Berkeley u-ds1400c top assembly instruction, Instructions for 36” x 48” p top, This is the top included in the u-ds1400c package – Martin Universal Design U-DS14 BERKELEY TABLE User Manual

Page 2

Advertising
background image

Step 1. Place top onto carpeted floor. Laying best surface face down.

Step 2. Attach Left and Right Metal Guides [B] by: Measuring 9” in

from left edge and mark with pencil, repeat with right side.

See above illustration. Measure 2.75” from front edge and

make pencil mark. Repeat with other side for Metal Guides.

Mark holes and then break surface with nail or awl. Secure

with [3] Phillip screws [E] per metal guide [B].

Step 3. Attaching Left and Right Brackets (already attached to base)

by: Measuring 9” in from left edge and mark with pencil,

repeat with right side. See above illustration. Measure 3.75”

from rear edge and make pencil mark. Repeat with other side

for Brackets. Break surface with nail or awl. Repeat with right

side. Secure with [4] Phillip Screws.

Please Note:

Reason for breaking top surface by tapping a nail or awl in screw

holes, is to make starting hole in surface to allow for easier attach-

ment of screws.

Instructions for 24” x 36” B Top

Instructions for 30” x 42” C Top

Bracket

Bracket

Step 1. Place top onto carpeted floor. Laying best surface face down.

Step 2. Attach Left and Right Metal Guides [B] by: Measuring 6” in

from left edge and mark with pencil, repeat with right side.

See above illustration. Measure 2” from front edge and make

pencil mark. Repeat with other side for Metal Guides. Mark

holes and then break surface with nail or awl. Secure with [3]

Phillip screws [E] per metal guide [B].

Step 3. Attaching Left and Right Brackets (already attached to base)

by: Measuring 5-5/8” in from left edge and mark with pencil,

repeat with right side. See above illustration. Measure 3” from

rear edge and make pencil mark. Repeat with other side for

Brackets. Break surface with nail or awl. Repeat with right side.

Secure with [4] Phillip Screws.

Please Note:

Reason for breaking top surface by tapping a nail or awl in screw

holes, is to make starting hole in surface to allow for easier attach-

ment of screws.

Metal

Guide

Metal

Guide

Instructions for 31.5” x 48” D Top

Step [2] 9” from left side to

left edge of

Metal Guide

Step [2] 9” from right side to

right edge of Metal Guide

Step [2] 2.75” from front edge

Step [3]

8-5/8” from left

edge

Step [3]

8-5/8” from

right edge

Step [3] 3.75” from back edge

Bracket

Bracket

Metal

Guide

Metal

Guide

Instructions for 36” x 48” P Top

Step [4] 5.5” from front edge

Step [3]

8-5/8” from

left edge

Step [3]

8-5/8” from

right edge

Step [5] 5.5” from back edge

Bracket

Bracket

Step [2] 9” from left side to

left edge of

Metal Guide

Step [2] 9” from right side to

right edge of Metal Guide

Step 1. Place top onto carpeted floor. Laying best surface face down.

Step 2. Attach Left and Right Metal Guides [B] by: Measuring 9” in

from left edge and mark with pencil, repeat with right side.

See above illustration. Measure 5.5” from front edge and

make pencil mark. Repeat with other side for Metal Guides.

Mark holes and then break surface with nail or awl. Secure

with [3] Phillip screws [E] per metal guide [B].

Step 3. Attaching Left and Right Brackets (already attached to base)

by: Measuring 9” in from left edge and mark with pencil,

repeat with right side. See above illustration. Measure 5.5”

from rear edge and make pencil mark. Repeat with other side

for Brackets. Break surface with nail or awl. Repeat with right

side. Secure with [4] Phillip Screws.

Please Note:

Reason for breaking top surface by tapping a nail or awl in screw

holes, is to make starting hole in surface to allow for easier attach-

ment of screws.

BERKELEY U-DS1400C TOP ASSEMBLY INSTRUCTION

Created 06/06 RPI

If you purchase optional Tops B, D or P use the appropriate instruction for the top assembly.

Step 1. Place top onto carpeted floor. Laying best surface face down.

Step 2. Attach Left and Right Metal Guides [B] by: Measuring 3” in

from left edge and mark with pencil, repeat with right side.

See above illustration. Measure 1.25” from front edge and

make pencil mark. Repeat with other side for Metal Guides.

Mark holes and then break surface with nail or awl. Secure

with [3] Phillip screws [E] per metal guide [B].

Step 3. Attaching Left and Right Brackets (already attached to base)

by: Measuring 2-5/8” in from left edge and mark with pencil,

repeat with right side. See above illustration. Measure 1.25”

from rear edge and make pencil mark. Repeat with other side

for Brackets. Break surface with nail or awl. Repeat with right

side. Secure with [4] Phillip Screws.

Please Note:

Reason for breaking top surface by tapping a nail or awl in screw

holes, is to make starting hole in surface to allow for easier attach-

ment of screws.

Step [3] 1.25” from back edge

Bracket

Bracket

Step [3]

2-5/8” from left

edge

Step [3]

2-5/8” from

right edge

Step [2] 3” from left side to

left edge of Metal Guide

Step [2] 3” from right side to

right edge of Metal Guide

Metal

Guide

Metal

Guide

Step [2] 1.25” from front edge

Step [2] 2” from front edge

Metal

Guide

Metal

Guide

Step [2] 6” from left side to

left edge of Metal Guide

Step [2] 6” from right side to

right edge of Metal Guide

Step [3] 3” from back edge

Step [3]

5-5/8” from

left edge

Step [3]

5-5/8” from

right edge

This is the top included in the U-DS1400C Package

Advertising