APTech AZ4571 User Manual

Page 2

Advertising
background image

Operation Manual

Pneumatic Diaphragm Valves (NC)

d.

On Series DV Monoblock valves the port that is common with the block valves is marked
with a “

C

”. No other marking is shown. Refer to Technical Bulletin 205 for schematics of

the monoblock configurations and more detailed information.

3. Install the valve using the appropriate method described below.

a.

For tube stub connections, weld connectors or other components to the tube stubs per
standard industry practice (reference SEMI standard F78).

b.

For metal face seal connectors, assemble connections per standard practice described by
fitting supplier (typically 1/8 turn past finger-tight).

c.

For compression-type connectors, insert the tube into the fitting until it stops. Tighten the
fitting by applying 1-1/4 turns of nut rotation.

i)

For reinstallation, mark the nut and the valve body before disassembly. This will

allow the nut to be returned to the original assembly position. Insert the tube and
attached ferrules into the fitting until fully seated. Rotate the nut until it is returned to
the original assembly position, and tighten slightly beyond marked position.

d.

Most valves can be attached to panels or mounting plates using the 10-32 or M5 female
thread mounting holes located in the bottom of the body (valves with M5 mounting holes
will be marked with a “5” on the bottom of the body). Special configurations or multi-
valve blocks may not have mounting holes or may have different size holes. Refer to the
specific data sheet or Technical Bulletin for detailed mounting information.

4. Connect a nitrogen or clean dry air actuation pressure supply to the valve actuation port

connection. The connection may be a 1/8 NPT female thread, 10-32 female thread, or
M5x0.8 female thread depending on the valve model.

a.

The AK/AP/AZ3571 and AK/AP/AZ4571 have two actuation ports. The port marked “1”
is the metered flow actuation port and the port marked “2” is the full open actuation port.

5. After installation, perform a leak test of all connections and welds per standard industry

practice (reference SEMI standard F1).

Manual 15000005 Rev 7

Page 2 of 4

Advertising