7a 7 5a – Rivera Primo Brute III Extreme 2007 Enclosed Belt Drive User Manual

Page 2

Advertising
background image

NOTE: In some cases it may be neccesary to remove material from

the inner primary to clearance for the belt. The belt must never come

in contact with the inner primary surface.

This outer primary

has been relieved in

the areas indicated

by arrows to allow for

adequate belt clear-

ance. Most installa-

tions require some

grinding on the inner

and outer primarys.

Now remove front &

rear pulleys for final

installation.

Install front pulley (without front

inside guide) & rear pulley with-

out the belt & check alignment as

shown(straight edge flush with

rear of rear pulley guide lines-up

with outer edge of front pulley) re-

move pulleys and proceed with

installation. If alignment isn’t sat-

isfactory use shims to space only

the front pulley. The rear pulley

will NEVER have shims behind it.

After ensuring proper pul-

ley alignment, again check

the areas indicated in the

photo for belt and/or pul-

ley clearance. Rear pulley

and belt clearance should

be checked before operat-

ing the motorcycle.

5

Check pulley alignment with a straight-edge

Check for proper belt clearance

RELIEVE INNER PRIMARY BOSS

4

Apply a thin coat of the

grease to the splines of

the transmission main-

shaft to act as both a

corrosion inhibitor, &

lubricant. The grease

also acts as a cushion

for the splines on the

transmission

main-

shaft during operation.

6

Apply grease to the shaft splines

Install the front & rear pulley

(clutch basket) & belt together.

Apply 3 drops blue thread lock to

the mainshaft threads. Install the

clutch hub nut HEX IN FIRST &

TORQUE

TO

80-90

FOOT

POUNDS. (The center adjustment

screw with o-ring will prevent

transmission oil from leaking thru

the main-shaft into the clutch

pack).

Install pulleys & belt

Apply a thin coat of the grease

to the splines of the motor

sprocket shaft to act as both a

corrosion inhibitor & lubricant.

6A

Grease sprocket shaft

3

Install front pulley

9/16-12 X 3” grade 8

bolt & cup washer. Use

1-2 drops of red thread

lock on the threads of

the bolt.

INSTALL & TIGHTEN

BOLT TO FACTORY

SPECS (155-165 FOOT

POUNDS) using a

quality impact gun.

8

8A

Use thread-lock here.

Shims are manufactured from high qual-

ity steel, precision ground for parallel &

flat surfaces to ensure perfect pulley

alignment. Correct pulley alignment &

correct belt tracking are a must for long

belt life. These shims make pulley align-

ment easy. Shims are available in .025",

.050", .070", & .100” thick dimensions, or

a kit of one-of-each size (1101-0500).

7A

7

5A

Page 2

Advertising