Installation

Air Handlers are designed for upfl ow, horizontal, and downfl ow
applications. The coils have a dry nitrogen holding charge and
are equipped with brazing stub refrigerant connections for easy
installation. Both models come equipped with a factory installed
TXV.

The installer should read the installation manual supplied with
the compressor section for refrigerant line set sizing, connec-
tion procedure, and other important information pertaining to the
system installation.

The installer should:
1. Where precise forming of refrigerant lines is required, a copper

tubing bender is recommended for small diameter tubing. One
should avoid sharp bends and contact of the refrigerant lines
with metal surfaces.

2. Refrigerant lines should be protected where they pass through

the raw edges of holes.

3. Air Handler must be level for proper condensate drainage.
4. Seal the openings into the cabinet to reduce risk of conden-

sate blow off from the coil.

Air Handler Installation

WARNING!

WARNING! Electric furnaces may be connected to more than
one supply circuit.

Charging the System
Air Handlers are designed to match HTS split units. For correct
charging, please refer to the Compressor Section IOM.

Upfl ow Installation
1. Position unit on plenum box or other suitable foundation. Provide

a minimum height for proper unrestricted airfl ow based on CFM
requirement for each unit size.

2. If a return air duct is connected to the air handler, it must be the

same dimensions as shown in the outline drawing in Figure 2.

3. Plenum box and unit should be isolated from the foundation

using a suitable isolating material.

4. Openings where fi eld wiring enters the cabinet must be

completely sealed. Location of power entry is shown on the
outline drawing.

5. After ductwork connections are made, seal airtight and per local

codes.

Downfl ow Installation
1. Position unit on plenum box or other suitable foundation. Provide

a minimum height for proper unrestricted airfl ow based on CFM
requirement for each unit size.

2. If a return air duct is connected to the air handler, it must be the

same dimensions as shown in the outline drawing in Figure 2.

3. Plenum box and unit should be isolated from the foundation

using a suitable isolating material.

4.

Openings where fi eld wiring enters the cabinet must be
completely sealed.
Location of power entry is shown on the
outline drawing.

5. After ductwork connections are made, seal airtight and per local

codes.

6. The unit is then placed with the blower side down and the coil is

replaced on the coil channel supports with the drain connections
at the bottom. The unit is now in downfl ow position with front
access.

Position the ECM wire harness connection at the 4 to 8 o’clock

position to prevent condensation from entering motor controller.

7. If a return duct is connected to the air handler, it must be the

same dimensions as the return opening.

8. After ductwork connections are made, seal airtight and per local

codes.

Horizontal Right Installation

For maximum effi ciency and customer ease of fi lter
maintenance, it is recommended that a properly sized remote
fi lter grille be installed for horizontal applications. Airfl ow should
not exceed the face velocity of the fi lter being used.

The factory

installed fi lter should then be removed from the unit.

1. To convert the unit to horizontal right, front access, slide the coil

out on the coil channel supports and rotate the complete coil 180
degrees.

2. The coil is then inserted back into the cabinet on the opposite

side coil channel supports. The unit is now horizontal right with
front access.

Position the ECM wire harness connection at the 4 to 8 o’clock

position to prevent condensation from entering motor controller.

3. If the unit is suspended, it must be supported from the bottom

near both ends as well as the middle to prevent sagging. The
service access must remain unobstructed. If the unit is supported
along the length of the front and back with rails, the air handler
only needs to be suspended at both ends. See Figure 1.

If the unit is not suspended it must be supported as mentioned

above and isolated carefully to prevent sound transmission.
Vibration isolators (purchased locally) must be placed under the
unit.

4. It is always recommended that an auxiliary drain pan be installed

under a horizontal air handler (See Condensate Piping) to prevent
possible damage to ceilings.

5. Isolate the auxiliary drain pan from the unit or from the structure.
6. Connect the auxiliary drain line to a separate drain line (no trap is

needed in this line) and terminate according to national and local
codes.

7. If a return duct is connected to the air handler, it must be the

same dimensions as the return opening shown in the outline
drawing on Figure 2.

8. Openings where fi eld wiring enters the cabinet must be

completely sealed.

9. After ductwork connections are made, seal airtight and per local

codes.

Horizontal Left Installation
1.

For maximum effi ciency and customer ease of fi lter
maintenance, it is recommended that a properly sized remote
fi lter grille be installed for horizontal applications. Airfl ow should
not exceed the face velocity of the fi lter being used.

The factory

installed fi lter should then be removed from the unit.

2. Unit is shipped from the factory in the upfl ow or horizontal

left confi guration. Unit conversion is not required. Conversion
is required: Rotate motor to ensure connection at the 4 to 8
o’clock position.