Foreword – Allard EB120 User Manual

Page 2

Advertising
background image

EB120 Advanced Ethanol Boiler

2

FOREWORD


Thank you for purchasing the Allard Research and Development EB120 – Advanced Ethanol Boiler.
Please take the time to read these instructions before you begin as they contain important information
about the installation and maintenance requirements, as well as safety instructions.

The EB120 is shipped with our intelligent remote control unit (the EB-A Controller), and a custom
temperature probe. With this remote, not only can you control the temperature and time duration of your
production run, but also control an external 120V 5A pump. The remote also allows for the manual
operation of the drain valve, a key-lock, and allows the selection of Fahrenheit or Centigrade for the
temperature reading; as well as displaying the EB120’s status via the 8 LEDs. Note also that one remote
control unit can control multiple EB120 boilers.

Every EB120 Advanced Ethanol Boiler is thoroughly tested before leaving the factory so there may be
small amounts of water inside the boiler when you receive the unit.

IMPORTANT

Read this manual before installation and operation.
This equipment must be installed by competent person.
Disconnect the power supply before exposing electrical connections.
Confirm the right voltage to the system.
This product is never to be operated by persons under the age of 21.
Ensure that you have obtained the proper permits before use.
Keep accurate and detailed records of your use of the EB120, and the ethanol produced.


SAFETY PRECAUTIONS for ethanol production

Do not smoke near the EB120, especially during operation.
Never operate the EB120 without the safety pressure relief valve installed.
Always ensure there is no blockage to the steam outlet line, or through the still.
Always operate the system in an area with plenty of ventilation.
Use caution, as the steam outlet, connecting pipes, and your still will reach high temperatures.

Advertising