Dealer preparation check list – Bush Hog 2846 User Manual

Page 5

Advertising
background image

DEALER PREPARATION CHECK LIST

2426, 2446, 2846 & 3226 QT LOADERS

BEFORE DELIVERING MACHINE - The following check list should be completed.

Use the Operator’s Manual as a guide.

o

Machine properly assembled.

o

All safety decals readable. (See decal page)

o

All bolts tightened to torque specifications given in torque chart.

o

Machine operates properly.

o

Customer has appropriate mounting kit for his tractor and loader.

o

Customer has appropriate attachments for loader operations. ( Buckets for lifting loose

materials; bale spear for lifting round bales; fork lift for lifting palletized material)

o

Operators manual has been delivered to owner and he has been instructed on the safe

and proper use of the front end loader.

Dealer’s Signature

THIS CHECK LIST TO REMAIN IN OPERATOR’S MANUAL

It is the responsibility of the dealer to complete the procedures listed

above before delivery of this implement to the customer.

CAUTION

IT IS RECOMMENDED THAT TRACTOR BE
EQUIPPED WITH ROLLOVER PROTECTIVE SYS-
TEM (ROPS) AND SEAT BELT BE USED FOR ALL
LOADER OPERATIONS.

4

Advertising
This manual is related to the following products: