Installation instructions, Step 1: rough in piping for shower – Bradley Smoker HN200 User Manual

Page 4

Advertising
background image

ADA Compliant Recess-Mounted Shower
HN200

Installation Instructions

Bradley Corporation • 215-1189 Rev. F; EN 02-342

4

Installation Instructions

NOTE: Flush the supply lines before making connections.

NOTE: Install the supply inlets no lower than 48" and no higher than 60" off of finished floor.

Step 1: Rough in piping for shower

NOTE: When facing the wall, the supply pipe to the left of the centerline is HOT.

1. Rough in 1/2" NPT hot and cold water supply piping for valve at the dimension shown in Figure

1 (piping supplied by installer).

2"

(51mm)

1/2" NPT

SUPPLIES

40"

(1015mm)

2-1/2"

(64mm)

TYP.

45"

(1143mm)

7-1/2"

(191mm)

NOTE: WALL OPENING RECESS

TO BE 4" (102mm) DEEP

C

L

3-3/4"

(95mm)

2"

(51mm)

NOTE: Due to differing state codes, if the
valve height is different from the indicated
43" (1091 mm), all dimensions within the
symbol must be changed by the same amount.

Example: If the code approved height is 40",
then 43" (1091mm) - 40" (1015mm) = 3"
(76mm). Result: Subtract 3" (76mm) from all
dimensions within the symbol.

15"

(381mm)

48"

(1219mm)

A.F.F.

18"

(457mm)

WALL

OPENING

OUTLINE

Figure 1

20"

(508mm)

38-1/8"

(968mm)

A.F.F.

72"

(1829mm)

A.F.F.

48"

(1219mm)

to 60"

(1524mm)

A.F.F.

BACK

WALL

FRONT OF

SHOWER

Advertising