Installation instructions continued, Step 2: make plumbing connections, Step 3: install face plate and grab bar – Bradley Smoker HN200 User Manual

Page 5

Advertising
background image

ADA Compliant Recess-Mounted Shower

Installation Instructions

HN200

Bradley Corporation • 215-1189 Rev. F; EN 02-342

5

Installation Instructions continued…

Step 2: Make plumbing connections

NOTE: Hoses need to be connected to 1/2" NPT pipe supply
before the shower is fastened to the wall.

1. Make water supply connections to the stainless steel hoses

(see Figure 2). Equa-Flo™ and Thermostatic= 1/2" NPT
Hot and Cold supplies. Single Valve, Accu-Zone™ Infrared
Control, Air Valve and Touch Time™ = 1/2" tempered
supply.

Step 3: Install face plate and grab bar

1. Position the face plate on the wall. Mark the wall and install

twelve wall anchors suitable for use with 1/4"-20 x 3/4"
button head Allen key screws (see Figure 3).

2. Attach the face plate to the wall with twelve 1/4"-20 x 3/4"

button head Allen key screws provided (see Figure 3).

3. Attach the grab bar to the wall.

• Position the “L” of the grab bar to fit the back wall of the

shower stall.

4. Use the flange as a template and mark the six screw hole

locations and install six anchors supplied by installer for
1/4"-20 x 1-1/4" flat head Allen key
screws (see Figure 3).

5. Secure the grab bar to the six wall

anchors using six 1/4”-20 x 1-1/4"
flat head Allen key screws (provided
by installer) (see Figure 3).

Figure 3

NOTE: ALL WALL
ANCHORS SUPPLIED
BY INSTALLER.

GRAB BAR
(S53-184)

1/4"-20 x 3/4"
BUTTON HEAD
ALLEN KEY SCREW
(12) PLACES
(160-143)

1/4"-20 x 1-1/4"
FLAT HEAD ALLEN
KEY SCREW

FACE PLATE

VALVE LEFT - SEAT RIGHT

Figure 2

VALVE LEFT
SEAT RIGHT

Advertising