Bard GVDM-26 User Manual

Page 10

Advertising
background image

Manual 2100-517
Page

10 of 11

CONTROL BOARD SEQUENCE of
OPERATION

The desuperheating control board will make a determination
whether or not to energize the pump relay inclusive on the
control board.

A. It will constantly monitor inputs from two temperature

sensors, Inlet & Outlet water sensors.

B. It will constantly monitor the Y signal.

C. Upon acknowledgment of Y signal, and following two

minutes, the control board will energize the pump relay.

D. After 1½ minutes, based on temperature difference

between Outlet & Inlet sensors, and the presence of Y
signal, the following will take place:

F

R

F

R

0

.

3

5

0

.

2

5

0

.

3

5

0

.

4

5

0

.

5

5

0

.

6

5

0

.

7

5

0

.

8

5

0

.

9

5

0

.

0

6

0

.

1

6

0

.

2

6

0

.

3

6

0

.

4

6

0

.

5

6

0

.

6

6

0

.

7

6

0

.

8

6

0

.

9

6

0

.

0

7

0

.

1

7

0

.

2

7

0

.

3

7

0

.

4

7

0

.

5

7

0

.

6

7

0

.

7

7

0

.

8

7

0

.

9

7

0

.

0

8

0

.

1

8

0

.

2

8

0

.

3

8

0

.

4

8

0

.

5

8

0

.

6

8

0

.

7

8

0

.

8

8

4

7

3

9

1

7

6

8

8

1

5

7

3

8

1

9

8

9

7

1

4

3

4

7

1

4

8

9

6

1

7

4

5

6

1

2

2

1

6

1

0

1

7

5

1

0

1

3

5

1

1

2

9

4

1

4

4

5

4

1

7

7

1

4

1

0

2

8

3

1

4

7

4

3

1

7

3

1

3

1

0

1

8

2

1

2

9

4

2

1

3

8

1

2

1

3

8

8

1

1

1

9

5

1

1

7

0

3

1

1

1

3

0

1

1

2

6

7

0

1

1

0

5

0

1

7

4

2

0

1

0

0

0

0

1

0

6

7

9

6

2

5

9

9

9

2

9

7

7

0

9

2

6

8

8

3

5

6

8

9

4

4

8

0

5

2

8

7

5

0

8

9

6

8

7

6

8

6

7

0

.

9

8

0

.

0

9

0

.

1

9

0

.

2

9

0

.

3

9

0

.

4

9

0

.

5

9

0

.

6

9

0

.

7

9

0

.

8

9

0

.

9

9

0

.

0

0

1

0

.

1

0

1

0

.

2

0

1

0

.

3

0

1

0

.

4

0

1

0

.

5

0

1

0

.

6

0

1

0

.

7

0

1

0

.

8

0

1

0

.

9

0

1

0

.

0

1

1

0

.

1

1

1

0

.

2

1

1

0

.

3

1

1

0

.

4

1

1

0

.

5

1

1

0

.

6

1

1

0

.

7

1

1

0

.

8

1

1

0

.

9

1

1

0

.

0

2

1

0

.

1

2

1

0

.

2

2

1

0

.

3

2

1

0

.

4

2

1

7

0

5

7

4

3

3

7

5

6

1

7

0

0

0

7

0

4

8

6

3

8

6

6

1

3

5

6

3

8

3

6

9

3

2

6

8

9

0

6

1

6

9

5

7

2

8

5

7

9

6

5

0

7

5

5

6

4

4

5

6

2

3

5

8

0

2

5

4

9

0

5

2

8

9

4

3

7

8

4

7

6

7

4

3

6

6

4

2

6

5

4

4

6

4

4

7

6

3

4

4

7

2

4

2

8

1

4

3

9

0

4

6

0

0

4

1

2

9

3

8

3

8

3

7

5

7

3

8

7

6

3

1

0

6

3

6

2

5

3

2

5

4

3

TEMPERATURE F vs RESISTANCE R OF TEMPERATURE SENSOR

1.) If temperature difference is greater than 3°F, then

the control will continue to energize pump relay.

2.) If temperature difference is less than 3°F, then the

control will de-energize the pump relay.

3.) The control will next wait for 10 minutes before

repeating Step #1 (above).

E. The Over Temperature Limit Switch is placed in series

with the line voltage. Therefore, continuity between L
of line voltage and L of pump output is forced broken
when the Over Temperature Limit Switch opens (see
Wiring Diagram).

F. The 3-amp fuse is put in series with the R connection to

the board. Whenever the fuse is blown, the control will
lose power and consequently, the relay will disengage.

Figure 5

THERMISTOR

Advertising