Bard GVDM-26 User Manual

Page 7

Advertising
background image

Manual

2100-517

Page

7 of 11

MIS-2651

INSULATION.

OUT TO DSH COIL INLET

HEATER

OUTLET

AND WRAP WITH PROVIDED

OUTLET THERMISTOR

NOTE: REMOVE DURING TUBE

AND WRAP WITH PROVIDED

SOLDERING, THEN RE-INSTALL

INSULATION.

AIR.

SOLDERING, THEN RE-INSTALL

NOTE: PUMP IS NOT SELF-PRIMING, IT I S

RECOMMENDED TO MANUALLY BLEED-OFF

NOTE: INSTALLER MUST INSURE THAT THE INLET THERMISTOR
IS RE-LOCATED BACK TO THE INLET TUBE AND THE OUTLET
THERMISTOR IS LOCATED BACK ON THE OUTLET TUBE.

VERIFY BY CONNECTIONS ON CONTROL BOARD

INLET FROM WATER

INLET THERMISTOR

NOTE: REMOVE DURING TUBE

AIR PURGE PORT

FROM DSH COIL

OUT TO WATER HEATER

Figure 2

AIR PURGE PORT

Advertising