Install the ductwork, Install support system – Best IS23 User Manual

Page 7

Advertising
background image

- 7 -

INSTALL THE DUCTWORK

Ducted configuration only.

NOTE: To reduce the risk of fire, use only
metal ductwork.

1. Decide where the ductwork will run between

the hood and the outside.

2. A straight, short duct run will allow the hood

to perform most efficiently.

3. Long duct runs, elbows, and transitions will

reduce the performance of the hood. Use
as few of them as possible.

4. Install a roof or wall cap. Connect 6" round

metal ductwork to cap and work back to-
wards hood location. Use duct tape to seal
the joints between ductwork sections.

INSTALL SUPPORT SYSTEM

1. At hood location, install 2 X 4 cross fram-

ing between ceiling joists using dimensions
shown.

2. Finish the ceiling surface. Be sure to mark

the location of the ceiling joists and cross
framing.

ROOF CAP

6” ROUND

DUCT

EAVE
VENT

HOOD

24” TO 30” ABOVE

COOKING SURFACE

(See “Adjust Support

Frame” section for

mounting restrictions.)

6” ROUND

ELBOW

DECORATIVE

FLUE

TOP VIEW OF

SUPPORT FRAME

7”

7”

CEILING

JOISTS

CROSS FRAMING

SUPPORT

FRAME

7”

DRYWALL

MOUNTING

SCREWS

6x70mm

WASHERS

6.4mm

Advertising