Dealer preparation check list – Bush Hog RDTH 84 User Manual

Page 5

Advertising
background image

DEALER PREPARATION CHECK LIST

RDTH ROTARY CUTTER

BEFORE DELIVERING MACHINE — The following check list should be completed.

Use the Operator’s Manual as a guide.

1. Assembled completed.

2. Gearbox filled with oil.

3. All fittings lubricated.

4. All shields in place and in good condition.

5. All fasteners torqued to specifications given in Torque Chart.

6. All decals in place and readable. (See decal page.)

7. Overall condition good. (i.e. paint, welds)

8. Operators manual has been delivered to owner and he has been instructed

on the safe and proper use of the cutter.

Dealers’s Signature

Purchaser’s Signature

THIS CHECKLIST TO REMAIN IN OPERATOR’S MANUAL

It is the responsibility of the dealer to complete the procedures listed

above before delivery of this implement to the customer.

3

Advertising