2 exhaust manifold procedure, 3 intake manifold procedure, 4 cylinder head procedure – Bryant Liquid-Cooled User Manual

Page 18

Advertising
background image

16 Bryant

Section 4 — Maintenance

Bryant Liquid-cooled 25 kW Generator

4.1

MAINTENANCE PERFORMED BY
AUTHORIZED SERVICE FACILITIES

A. EVERY THREE MONTHS

1. Check battery condition.
2. Inspect and test fuel system.
3. Check transfer switch.
4. Inspect exhaust system.
5. Check engine ignition system.
6. Check fan belts.

B. ONCE EVERY SIX MONTHS

1. Test Engine Safety Devices (low oil pressure, low

coolant level, high coolant temperature).

C. ONCE ANNUALLY

1. Test engine governor; adjust or repair, if needed.
2. Clean, inspect generator.
3. Flush cooling system.

D. FIRST 100 OPERATING HOURS

1. Change engine oil and oil filter. After initial

change, service engine oil and filter at 150 oper-
ating hours or six months, whichever comes first.

2. Retorque cylinder head (see torque specs).
3. Retorque intake and exhaust manifold (see

torque specs).

E. EVERY 500 OPERATING HOURS

1. Service air cleaner.
2. Check starter.
3. Check engine DC alternator.

F. EVERY 800 OPERATING HOURS

1. Retorque cylinder head (see torque specs).
2. Retorque intake and exhaust manifold (see

torque specs).

3. Check engine compression.
4. Check valve clearance.

4.2

EXHAUST MANIFOLD PROCEDURE

1. If necessary, clean gasket surfaces on exhaust

manifold and cylinder head.

2. Install exhaust manifold and exhaust manifold

gasket.

3. Install fasteners.

NOTE:

Exhaust manifold fasteners must be tightened in
two stages.

4. Tighten fasteners to 20-30 N-m (15-22 lb-ft) dur-

ing the first stage.

5. Retighten fasteners to 60-80 N-m (44-59 lb-ft)

during the second stage.

4.3

INTAKE MANIFOLD PROCEDURE

1. Clean and inspect the mounting surfaces of the

intake manifold and the cylinder head. Both sur-
faces must be clean and flat (Figure 4.1).

2. Clean and lightly oil the manifold bolt/stud

threads.

3. Install a new lower intake manifold gasket.
4. Position the lower intake manifold to the cylinder

head.

5. Install retaining bolts/studs finger tight.
6. Tighten all bolts/studs to specifications in the

tightening sequence shown:

• First pass = 7=10 N-m (5-7 lb-ft).
• Final pass = 26-38 N-m (19-28 lb-ft).

Figure 4.1 — Intake Manifold Installation

4.4

CYLINDER HEAD PROCEDURE

1. Position head gasket on the block (Figure 4.2).
2. Position cylinder head to cylinder block.
3. Install 10 cylinder head bolts in numerical

sequence. Tighten to 70 N-m (52 lb-ft) in
sequence. Retighten to 70 N-m (52 lb-ft) in
sequence. Then turn all head bolts an additional
90 - 100 degrees in sequence.

Figure 4.2 — Cylinder Head Installation

Advertising
This manual is related to the following products: