Bunn TU3Q-EZ User Manual

Page 17

Advertising
background image

Page 17

SERVICE (cont.)

ON/OFF SWITCH

FIG. 6 ON/OFF SWITCH

P1187.40

Location:

The ON/OFF switch is located in the front of the

hood, above and to the left of the brew funnel.

Test Procedure:
1. Disconnect the brewer from the power source.
2. Remove the black and white/violet wires from the

switch terminals.

3. With a voltmeter, check the voltage across the

black wire removed from the ON/OFF switch and
the white wire remaining on the switch terminal.

4. Connect the brewer to the power source. The in-

dication must be 120 volts ac for two wire 120
volt models.

5. Disconnect the brewer from the power source.

If voltage is present as described, proceed to #6.
If voltage is not present as described, refer to the

Wir-

ing Diagrams

and check the wiring harness.

6. Check for continuity across the center and end

terminals of the top row when the switch is in the
“ON” position.

If continuity is present as described, replace the wires,
the switch is operating properly.
If continuity is not present as described, replace the
switch.

Removal and Replacement:
1. Remove the wires from the switch terminals.
2. Compress the clips inside the hood and gently

push the switch through the opening.

3. Push the new switch into the opening and spread

the clips to hold the switch captive in the hood.

4. Refer to FIG. 7 when reconnecting the wires.

FIG.7 ON/OFF SWITCH TERMINALS

P1801

BLK to Power Cord

WHI to Power Cord

WHI/VIO to
Control Board J1-8

29460 061599

Advertising