S-cape ii mr reprogramming separating 2 beds, Pos 1 – InnoMax Scape Hand Control User Manual

Page 10

Advertising
background image

10

S-

Cape II MR Hand Control Operation Guide

The six step procedure below is required to separate 2 hand controls from operating 2
beds. One hand control per bed operation will result. Before beginning, make certain the
beds are plugged into a working grounded electrical outlet.

STEP 1

On bed 1, press the learn button for 1
second and release. The bed will be
equipped with either a power down box or
J box (FIGURE 1).

STEP 2

On hand control 1, simultaneously press and
hold the

Pos 1

and the head massage on/off

buttons. The transmission indicator light will
flash slowly and then flash rapidly. Continue
to hold for 2 seconds and then release the
buttons (FIGURE 2).

STEP 3

Repeat Step 1 and Step 2 with hand control 1.
Note: wait 90 seconds before proceeding to
Step 4.

STEP 4

On bed 2, press the learn button for 1
second and release. The bed will be
equipped with either a power down box or
J box (FIGURE 1).

STEP 5

On hand control 2, simultaneously press and
hold the

Pos 1

and the head massage on/off

buttons. The transmission indicator light will
flash slowly and then flash rapidly. Continue
to hold for 2 seconds and then release the
buttons (FIGURE 2).

STEP 6

Repeat Step 4 and Step 5 with hand
control 2.

Independent hand control operation is
now restored (hand control 1 operating
bed 1; hand control 2 operating bed 2).

FIGURE 1: Power down box and J box receiver units.

J BOX

POWER
DOWN BOX

LEARN
BUTTON

LEARN

BUTTON

NOTE: POWER

DOWN BOX IS

NOT MOUNTED

TO BED FRAME.

J BOX IS

MOUNTED TO

THE BOTTOM

SIDE OF THE

BED FRAME.

HAND CONTROL

BED 1

HAND CONTROL

BED 2

FIGURE 2

TRANSMISSION

INDICATOR LIGHT

HEAD MASSAGE
ON/OFF BUTTON

POS 1 BUTTON

S-CAPE II MR REPROGRAMMING

separating 2 beds

Advertising