S-cape ii mr programming 2 hand controls - 2 beds, Pos 1 – InnoMax Scape Hand Control User Manual

Page 9

Advertising
background image

9

S-

Cape II MR Hand Control Operation Guide

HAND CONTROL

BED 1

HAND CONTROL

BED 2

The six step procedure below is required to program 2 hand controls to operate 2 beds.
Before beginning, make certain the beds are plugged into a working grounded electrical
outlet.

STEP 1

On bed 1, press the learn button for 1
second and release. The bed will be
equipped with either a power down box or
J box (FIGURE 1).

STEP 2

On hand control 1, simultaneously press and
hold the

Pos 1

and the head massage on/off

buttons. The transmission indicator light will
flash slowly and then flash rapidly. Continue
to hold for 2 seconds and then release the
buttons (FIGURE 2).

STEP 3

Repeat Step 1 and Step 2 with hand control 2.

STEP 4

On bed 2, press the learn button for 1
second and release. The bed will be
equipped with either a power down box or
J box (FIGURE 1).

STEP 5

On hand control 1, simultaneously press and
hold the

Pos 1

and the head massage on/off

buttons. The transmission indicator light will
flash slowly and then flash rapidly. Continue
to hold for 2 seconds and then release the
buttons (FIGURE 2).

STEP 6

Repeat Step 4 and Step 5 with hand
control 2.

Two hand controls are now programmed
to operate two beds.

FIGURE 1: Power down box and J box receiver units.

J BOX

POWER
DOWN BOX

LEARN
BUTTON

LEARN

BUTTON

NOTE: POWER

DOWN BOX IS

NOT MOUNTED

TO BED FRAME.

J BOX IS

MOUNTED TO

THE BOTTOM

SIDE OF THE

BED FRAME.

TRANSMISSION

INDICATOR LIGHT

FIGURE 2

HEAD MASSAGE
ON/OFF BUTTON

POS 1 BUTTON

S-CAPE II MR PROGRAMMING

2 hand controls - 2 beds

Advertising