1200w generator, Maitenance schedule, Period maintenance required – Steele Products SP-GG120CM User Manual

Page 24

Advertising
background image

23

Maitenance Schedule

The maintenance procedures should be performed according to the following.

1200W Generator

Period

Maintenance Required

Everyday Starting

First 20 hours

Every 25 hours

Every 50 hours

Every 100 hours

Annually or every

300 hours

• Check oil

• Change engine oil

• Check the oil level
• Fill fuel
• Check recoil start
• Check air intake and cooling area
• Check fuel hose for cracks or damage

• Check oil
• Replace air filter
• Check/clean spark plug
• Check spark arrestor
• Check/clean fuel valve
• Check/clean carburetor

• Check and adjust the valves or clearance
• Check cooling fan for damage
• Change Spark arrestor

• Check and adjust idle speed
• Check air cleaner filter

Advertising