Assembly, Warning – Steele Products SP-GMK049 User Manual

Page 14

Advertising
background image

ASSEMBLY

1.) Open the box
Remove the machine from the box, check the machine for damage, and
make sure all the components are complete. (Fig.1) Page 2 .
2.) Assemble the machine
a.) Rotate the machine by 90 degrees like (Fig.2), the air filter cover would
be on the top side, use the accessory box to put under the gear case like
(Fig.3) Page 2.
b.) Remove the four Bolts M8X25,and the NUTs M8 as per (Fig.3) Page 2.
c.) Assemble the right control handle on the connect plate from the right
side.(Fig. 4) Page 2.
d.) Assemble the left control box on the connect plate from left side, use
the bolts and nuts which where dismounted on step (b) (Fig. 5) Page 2.
e.) Tighten the bolts and nuts. (Fig 6) Page 2.
f.) The Auger should look like (Fig 7) Page 3.
3.) Check and change the Bit
a.) This unit is equipped with one bit, make sure the bit is secured to the
Auger head before starting by using the tool that was supplied to you.
Tighten the M8 screw clockwise.(Fig 9) Page 4.
b) To change the bit, remove the screw M8 counter-clockwise. The
replacement bit must be specifically for this machine. (Fig. 8) Page 4.

Warning!

Always follow the safety rules. Do not lock the power drill

onto fixed supports. Do not apply tools or applications other than the
ones indicated by the manufacturer onto the power drill.

12

Advertising