Option a, Step 4: chain hoist drive – Mueller Roll-Up Door C250 User Manual

Page 6

Advertising
background image

6

877-2-MUELLER

Axle Support

Wall

STEP 4: CHAIN HOIST DRIVE

(OPTIONAL) (N/A FOR L250 MODEL)

Option A

A

Position chain hoist assembly on door axle so that the

chain hoist gear engages the ring gear. NOTE: Do not
tighten set screws until tension has been added in Step 16.

B

The opening edge of guides should be

inset a very small amount (about 1/8
inch), from the door jamb opening on
each side to minimize the potential
of hitting the guides when enter-
ing through the door opening. Both
guides must be plumb. Note: If jambs
are installed correctly the outside to
outside measurement of guides should
be approximately 1 inch wider than
the curtain width.

C

Once both guides have been correctly

positioned, attach them to the jambs
using the appropriate fastener at each
hole location.

ITEM

JAMB

FASTENERS

DRILL SIZE

PROVIDED FASTENERS

Steel

3/8” - 1” Hex Bolt & Nut

7 1/16”

Provided

BRACKETS Concrete/Filled Block

3/8” - 3/4” Powers Wedge-Bolt

Powers 01316

Not Provided

Wood

3/8” - 7x3” Lag Screw

Optional

Not Provided

Steel

1/4” - 14x1 - 3/4” TEK Screw

None

Provided

GUIDES

Concrete/Filled Block

1/4” x 1 3/4” Powers Wedge-Bolt

Powers 01314

Not Provided

Wood

1/4” - 10x1” Lag Screw

Optional

Not Provided

Advertising