Step 7: non-tension end step 5: electric operator, Step 6: tension end, Step 7: non-tension end – Mueller Roll-Up Door C250 User Manual

Page 7

Advertising
background image

WWW.MUELLERINC.COM

7

Spring Roll Pin

Dual Tensioner

Tensioning Hub

Set Screw

Wall

Axle

A

Using dual tensioner assembly’s

spring roll pin located in knurled
wheel, rotate upward in the
direction that clears the axle.

B

Slide dual tensioner assembly

vover axle and tensioning hub,
with arrow pointing toward wall.
Release spring roll pin.

Wall

Axle

Axle Support

Set Screws

STEP 7: NON-TENSION END

STEP 5: ELECTRIC OPERATOR

(OPTIONAL)

A

Install as per instruction provided in electric operator kit.

NOTE:

Use the DUAL TENSIONER and not the U-BOLT that is in the Operator Kit.

STEP 6: TENSION END

RIGHT SIDE OF DOOR

(LOOKING FROM THE INSIDE OUT)

IS RECOMMENDED

STEP 7: NON-TENSION END

A

Slide axle support over axle,

with arrow pointing toward wall.

Advertising