Service, Engine shroud removal, Engine shroud installation – MBW MM90 User Manual

Page 13: Drum removal, Drum installation, Ervice, Torque chart engine shroud removal

Advertising
background image

- 10 -

S

ERVICE

Assembly and disassembly should be performed by a
service technician who has been factory trained on MBW
equipment. The unit should be clean and free of debris.
Pressure washing before disassembly is recommended.

• Prior to assembly, wash all parts in a suitable cleaner or

solvent.

• Check moving parts for wear and failure. Refer to the

Replacement section in this manual for tolerance and
replacement cycles.

• All shafts and housings should be oiled prior to pressing

bearings. Also, ensure that the bearings are pressed
square and are seated properly.

• All gaskets and seals should be replaced after any

disassembly.

Torque Chart

Engine Shroud Removal

Refer to Drivetrain Assembly, page 16.

1.

Disconnect wiring harness (#18) from engine by un-
screwing ring terminal from engine and unplugging
bullet connector.

2.

Remove automatic safety grid lifter from safety grid.

3.

Remove four bolts (#25), washers (#27), and lock-
nuts (#26) securing shroud to frame.

4.

Carefully lift shroud straight up to avoiding damaging
engine or drive components. Approximate weight is
85 pounds.

Engine Shroud Installation

Refer to Drivetrain Assembly, page 16.

1.

Lift shroud over engine and drive components and
lower it straight down onto frame. Hold grid opener
out of the way while lowering.

2.

Align shroud with edges of frame and tighten bolts
(#25), washers (#27), and locknuts (#26) in place.

3.

Lift grid opener into position and pin to safety grid.

4.

Connect wiring harness (#18) to engine by grounding
the ring terminal to the engine and inserting the bullet
connector into the splice terminal.

Drum Removal

Refer to Drum Assembly, page 14.

1.

Remove engine shroud before attemping to remove
mixing drum.

2.

Mark the front and rear pillow block (#5) locations on
the frame to aid in the alignment during installation.

3.

Remove all four bolts (#25), washers (#28 & #10),
lockwashers (#27), and locknuts (#26) holding drum
pillow blocks to frame.

4.

If lifting drum by hoist, wrap chain around main shaft
and pass chain through paddles to stabilize. If lifting
drum by forklift, place blocks on forks to prevent drum
from rolling. Approximate weight is 250 to 300
pounds, depending on model.

Drum Installation

Refer to Drum Assembly, page 14.

1.

Lower drum onto frame supports. Pillow blocks (#5)
should be snug to trunnions (#8) to eliminate
excessive endplay.

SIZE

GRADE 2

GRADE 5

GRADE 8

1/4-20

49 in

lbs

76 in

lbs

9 ft

lbs

1/4-28

56 in

lbs

87 in

lbs

10 ft

lbs

5/16-18

8 ft

lbs

13 ft

lbs

18 ft

lbs

5/16-24

9 ft

lbs

14 ft

lbs

20 ft

lbs

3/8-16

15 ft

lbs

23 ft

lbs

33 ft

lbs

3/8-24

17 ft

lbs

26 ft

lbs

37 ft

lbs

7/16-14

24 ft

lbs

37 ft

lbs

52 ft

lbs

7/16-20

27 ft

lbs

41 ft

lbs

58 ft

lbs

1/2-13

37 ft

lbs

57 ft

lbs

80 ft

lbs

1/2-20

41 ft

lbs

64 ft

lbs

90 ft

lbs

9/16-12

53 ft

lbs

82 ft

lbs

115 ft

lbs

5/8-11

73 ft

lbs

112 ft

lbs

159 ft

lbs

5/8-18

83 ft

lbs

112 ft

lbs

180 ft

lbs

3/4-16

144 ft

lbs

200 ft

lbs

315 ft

lbs

1-8

188 ft

lbs

483 ft

lbs

682 ft

lbs

1-14

210 ft

lbs

541 ft

lbs

764 ft

lbs

1-1/2-6

652 ft

lbs

1462 ft

lbs

2371 ft

lbs

M 6

3 ft

lbs

4 ft

lbs

7 ft

lbs

M 8

6 ft

lbs

10 ft

lbs

18 ft

lbs

M 10

10 ft

lbs

20 ft

lbs

30 ft

lbs

CONVERSIONS

in

lbs x 0.083 = ft

lbs

ft

lbs x 12 = in

lbs

ft

lbs x 0.1383 = kg

m

ft

lbs x 1.3558 = N

m