Service – Bunn AFPO-3 SL User Manual

Page 10

Advertising
background image

10

J4

J1

J2

J3

SERVICE

CIRCUIT BOARD

FIG. 2 CIRCUIT BOARD

P1520

Location:

The circuit board is located inside the autofill box,

mounted on the right side of the solenoid mounting

bracket under the switch panel.

Test Procedure:

1. Disconnect the dispenser from the power source.

2. Disconnect the ten pin plug on the main wiring

harness from the connector on the circuit board.

3. Connect the dispenser to the power source. With

a voltmeter, check the voltage across the black

wire(#3) and the white wire (#6). The indication

must be:

a) 120 volts ac for two wire 120 volt models.

b) 200 to 240 volts ac for two wire 200 or 240 volt

models.

FIG. 3 CIRCUIT BOARD CONNECTOR LOCATION

P1528

c) 230 volts ac for two wire 230 volt models.

4. Disconnect the dispenser from the power source.

If voltage is present as described, replace the circuit

board.

If voltage is not present as described, refer to the

Wiring Diagrams and check main wiring harness.

Removal and Replacement:

1. Remove the four #8-32 keps nuts securing the

switch mounting bracket. Set aside with the wires

attached.

2. Remove the circuit board shield and set aside for

reassembly.

3. Disconnect the ten pin plug from the main wiring

harness to the circuit board.

4. Remove the six #4-40 screws and spacers securing

the circuit board to the solenoid mounting bracket.

Remove circuit board and discard.

5. Install new circuit board using #4-40 screws and

spacers to secure the circuit board to the solenoid

mounting bracket. The spacers must be between the

solenoid mounting bracket and the circuit board.

6. Place circuit board shield over the circuit board.

7. Install switch panel assembly and secure with four

#8-32 keps nuts.

8. Refer to Fig. 3 for circuit board ten pin connector.

41093 040408

Advertising