13

5. Erection and start-up

The control tables must be set up at a suffi ciently safe distance from the loads to be lifted
or moved.
Both the load and the operating equipment must be easily observed from the control table.
Make sure that the control table is standing securely. If necessary, pack it up with suitable
materials.

NOTE:
Make sure that you set up all other components being used in accordance with
the separate operating instructions for these components.

CAUTION / ATTENTION!
Make sure that there are no persons remaining in the danger area!

ATTENTION!
When commissioning you must observe the instructions and regulations in the
separate operating instructions of the additional components that are used in
your rerailing system!

Work to be carried out before commissioning:

Before commissioning you must carry out a visual check for damage and leaks on all
components being used. Damaged components must not be used and must be replaced!
The hydraulic components must be bled to remove air before commissioning!

Commissioning:

CAUTION / ATTENTION!
Secure the vehicle to be rerailed in accordance with the regulations to prevent its
rolling away, slipping and tipping over!

Procedure:

1. Set up all the components being used in accordance with the corresponding operating

instructions. When setting up you must comply with all the applicable standards, guidelines,
regulations and statutes! Then connect all the hydraulic components as described in the
Chapter "Connecting the hydraulic equipment".

Moving the control lever to the middle (preselection valve is actuated) on the operator side,
in each case the left or right side is pressurised. After moving the middle lever to one side,
the condition of the other side remains static.