Lukas Double-acting Rope-lift cylinder User Manual

Page 9

Advertising
background image

9

9.2

Tilting set (3) comprising:

-

Swivel base (3.1)

-

Radius plate (3.2)

-

Piston guard plate (3.3)
Telescopic cylinder HP 25 / T 450 R (has to be ordered separately)

9.3

Lifting belt (4) comprising:

-

Lifting belt with plastic rope (4.1)

-

Rope roller (4.2)

-

Pressure piece (4.3)

9.4

Holding rope (5)

9.5

Shackle (6)

10

Dismantling of components

Dismantle the components in the reverse order of the installation sequence. Before final
dismantling of equipment, it must be ensured that:

——> The load is in a stable, immovable position

<——

——> The hydraulic power pack drive motor must be shut down

<——

——> All hoses must be depressurised, by:

<——

-

Briefly moving the switch control valves to "SENKEN" (lowering) (pressure discharge from
the hoses) and back to the centre position.

-

Disconnect the DEPRESSURISED hoses in this order:
——> Hose, piston side

red

——> Hose, rod side

blue

11

Maintenance

11.1 Mechanical inspection

Components must be checked to establish that they operate perfectly after each usage
(clean beforehand if dirty):

-

Each piston must be checked for smooth retraction (cylinder/ piston O.K.?).

-

Check whether all hydraulic screwed connections on cylinders and hoses are still tight; tighten
them if necessary.

-

Check whether mechanical damage is evident on the mechanical parts and hoses of cylinders.

-

Check on all signs: whether warnings, operation and control symbols and other markings
(colour codings) are present and legible.

-

Check whether all safety equipment (protective guards etc.) is present and in perfect condition.

-

Check whether the accessories (radius plates, header plates, etc.) are in perfect condition.

Advertising