Synergy 5203 - Jeep TJ/LJ Front Cage Kit User Manual

Page 4

Advertising
background image

and bolt the floor plates until you position the A-pillar tubes and center the floor plate
on the A-pillar tubes.


6. Remove the paint on the factory cage around the areas to be welded. The will be

between the holes that mounted the side bars to the B-pillar and the middle of the B-
pillar where the A-pillar spreader tubes go.

7. It is recommended to position all the tubes and square them before you do any welding

on the tubes.

8. Position the new A-pillar upright and over the door tubes, the tube is in two pieces, the

splice is above the dash. Use the provided 1 ½ diameter short tube slugs at the splice.
Drill a few ½” holes in the A-pillar tubes so you can rosette weld the tubes to the
inner slug. Leave a 1/8-1/4 gap between the tubes so the weld will weld the ends of
the two tubes to the inner tube slug. The upper end of the door tube should be located
in the middle of the two bolt holes that the original door bars attached to the B-pillar.
Tack weld the door tube to the B-pillar.

Advertising