Synergy 5203 - Jeep TJ/LJ Front Cage Kit User Manual

Page 6

Advertising
background image

10. Rotate the lower A-pillar tube to align to the center the floor plate, drill the floor and

attach the floor plate using the supplied 3/8 hardware. You will need to cut access
hole in the panel underneath the floor panel to install the nuts and washers
underneath. If you are using the frame tie-in kit, cut out the whole section of the
bottom panel to install the bushing plate.

11. Position the upper windshield cross tube and spreader tubes. The spreaders tube

center spacing is up to you but 8” center spacing will match the rear cage diagonal
tubes. The bend in the spreader tubes goes to the front. Use a ratchet strap front to
back to around the B-pillar and windshield tube to hold these tubes in place.

Advertising