MAINTENANCE

Periodical maintenance and checks

(continued)

Prior to first use of the

POP-UP PUSH 6 ECO

, all daily/pre-use checks must be

undertaken. If the machine has been in storage for a long period of time, it may be

necessary to undertake checks and tests as per the table on the preceding page (e.g.

lubrication, hydraulic oil, battery condition).

The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) require that

lifting equipment for lifting persons must be THOROUGHLY EXAMINED every six

months.

Following any maintenance on the

POP-UP PUSH 6 ECO

, a full function test should

be undertaken to ensure correct operation of the machine.

It is essential that only manufacturer’s approved replacement parts are used when

maintaining and servicing the

POP-UP PUSH 6 ECO

.

Failure to do so may result in an unsafe or unstable machine.

Storage

The electrical components of this

POP-UP PUSH 6 ECO

are not protected from

external weather conditions and the machine should therefore not be stored outdoors.

Storage in a clean, dry indoor environment is recommended.

Frequent checks on the condition of the machine should be made to ensure no

excessive deterioration occurs due to the environment in which the machine is housed.

Lubrication

The required lubrication points are listed as per the table on the preceding page.

These include: roller guides, grease nipples, pivot pins and castor mounts.

The lubricant recommended for use with this

POP-UP PUSH 6 ECO

is: standard

machine grease.