Wheel torque chart -21 – JLG 1850SJ Operator Manual User Manual

Page 153

Advertising
background image

SECTION 7 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE

3121618

– JLG Lift –

7-21

1.

Start all nuts by hand to prevent cross threading. DO NOT
use a lubricant on threads or nuts.

2.

Tighten nuts in the following sequence:

3.

The tightening of the nuts should be done in stages. Follow-
ing the recommended sequence, tighten nuts per wheel
torque chart.

4.

Wheel nuts should be torqued before first road use and after
each wheel removal. Check and torque every 3 months or
150 hours of operation.

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

Table 7-14. Wheel Torque Chart

TORQUE SEQUENCE

1st Stage

2nd Stage

3rd Stage

35 ft. lbs.

(45 Nm)

80 ft. lbs.

(100 Nm)

140 ft. lbs.

(185 Nm)

Advertising