Assembly, Assembly -12 – JLG 1250AJP Service Manual User Manual

Page 252

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-12

– JLG Lift –

3121171

13. If necessary, remove the shoulder screws, retaining

ring, and pin that secures the barrel end of the level
cylinder to the main boom fly section and remove
the level cylinder from the fly section.

Assembly

1. If removed during assembly, install the level cylinder

into the fly section. Install the shoulder screws,
retaining ring, and pin that secures the barrel end of
the level cylinder to the main boom fly section.

2. If removed during assembly, install the pin retainer

sleeve, bolt (screw prior to S/N 80869), and nut
securing the lower link to the upper link. On
machines using the bolt and nut, torque to

190 ft.

lbs. (260 Nm)

. Position the upper link to the boom

nose and secure in place with the pivot pin, keeper
pin, and bolt.

3. If removed during assembly, install the telescope

cylinder into the fly section. Install the shoulder
screws, retaining rings, and pin that secures the rod
end of the telescope cylinder to the main boom fly
section.

4. Using an adequate lifting device, slide the main fly

section and telescope cylinder into the main boom
base section.

NOTE: The main boom fly section including telescope cylin-

der and level cylinder weighs approximately 2000
lbs. (907 kg).

Advertising