JLG 1250AJP Service Manual User Manual

Page 479

Advertising
background image

SECTION 6 - JLG CONTROL SYSTEM

3121171

– JLG Lift –

6-47

12. If the tower lift wiring and hosing is properly installed

and not damaged, hit enter. The screen will read:

13. If the tower telescope wiring and hosing is properly

installed and not damaged, hit enter. The screen will
read:

14. The control system will next calibrate the LIFT, TWR

LIFT, and TWR TELE valves. This can be confirmed
by watching the LED’s on the respective valves as
they are being calibrated. When the valves are cali-
brated, the screen will read:

NOTE: It may take several minutes per valve section for the

calibration procedure.

15. After completing Boom Valve Calibration, hit ESC

twice to go back to CALIBRATIONS.

Advertising