JLG 120HX ANSI Operator Manual User Manual

Page 57

Advertising
background image

SECTION 4 - MACHINE OPERATION

3120685

– JLG Lift –

4-5

4.6

PARKING AND STOWING

Park and stow machine as follows:

1.

Park machine in travel position; boom lowered over
rear, all access panels and doors closed and
secured, ignition off, turntable locked.

2.

Check that brakes hold machine in position.

3.

Chock wheels front and rear.

4.

Turn off SELECT SWITCH and remove key.

4.7

PLATFORM

Loading From Ground Level

1.

Position chassis on a smooth, firm and level surface.

2.

If total load (personnel, tools and supplies) is less
then rated capacity, distribute load uniformly on plat-
form floor and proceed to work position.

Loading From Positions Above Ground Level

Before loading weight to platform above ground level:

1.

Determine what the total rated capacity weight will
be after additional weight is loaded (personnel, tools
and supplies).

2.

If total weight in platform will be less then rated
capacity, proceed with adding weight.

Platform Level Adjustment

1.

Leveling UP. Depress footswitch to raise platform,
position PLATFORM LEVEL control switch UP and
hold until platform is level.

2.

Leveling DOWN. Depress footswitch to lower plat-
form, position PLATFORM LEVEL control switch to
DOWN and hold until platform is level.

Platform Rotation

1.

Depress footswitch to rotate platform to the left,
PLATFORM ROTATE control is positioned to the
LEFT and held until desired position is reached.

2.

Depress footswitch to rotate platform to the right,
PLATFORM ROTATE control is positioned to the
RIGHT and held until desired position is reached.

Advertising