2 cable installation, 3 startup procedure, 4 operational readiness check – ADS-TEC OPC5012 User Manual

Page 13: Industrial pcs opc5012

Advertising
background image

Industrial PCs OPC5012

© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen

13

4.2

C

ABLE INSTALLATION

The device interfaces and power supply plug are found on the side or the back of the

casing. Care should be taken not to damage the pins when connecting the plugs.

4.3

S

TARTUP PROCEDURE

For 24 V DC device:

Place the cable end

sleeves of the power cable wires in the terminals.

Connect the cable for serial / parallel data transfer and fasten the plugs to the sockets.

Connect all further required cables and secure against slippage.

4.4

O

PERATIONAL READINESS CHECK

Connect the power cable to the power source.

Check the device to determine whether hidden damages have been caused by
improper transport, incorrect operation or storage conditions or improper handling
(e.g. smoke emission from the device, etc.). If damages are found, immediately

shut down the device and protect it against unintentional startup.

Advertising