Navi-trac installation safety guidelines – Anchor NAVI-TRAC 30 WIDE HIP-END User Manual

Page 6

Advertising
background image

6

NAVI-TRAC Installation Safety Guidelines

Your installation techniques will evolve to fit the needs of your clients, the experience level of your crews, the nature of
other tentage on-site, and the equipment that you have most readily available. We encourage you to begin with a crew of
(4) workers and only reduce this number as your experience level allows you to do so
safely. Whatever techniques you adapt for your crews, we encourage you to keep safety utmost in mind.

Please read through this assembly manual completely before beginning your installation. Be sure the proper equipment,
crew and safety precautions are in place. We hope that you enjoy the design features of the NAVI-TRAC each time the
unit is installed.

1.

It is recommended that workers wear safety shoes and hard-hats on site.

2.

When moving beam sections by hand, use proper lifting techniques to protect the back, and

avoid pinching fingers while making hardware connections.

3.

Never permit bystanders or uninvolved to stand or walk even briefly in the falling path of a beam as it is being

raised or lowered.

4.

Be aware to avoid contact of beams with any overhead power lines near the site.

5.

When anchoring the structure, avoid all underground power lines and gas lines or other utility

easements. Local authorities should be able to map the location of these obstacles.

6.

Keep site clear of debris to avoid tripping, especially while carrying components or bundles of fabric.

7.

Do not drag bundles of fabric on concrete, asphalt, or ground as this can cause damage to the

fabric from abrasion through the bag.

8.

When lifting the NAVI-TRAC frame, be sure to use the heavy duty NAVI-TRAC frame lift. The standard

Anchor frame lift was not designed for the weight of the NAVI-TRAC frame. When lifting each side of

an end section, (2) NAVI-TRAC frame lifts should be used.


9.

Before pivoting beams to vertical, clear the area

of items

that could cause tripping or slipping.

10.

Before pivoting middle beam, install the cross-cable for safety bracing. The cross-cable should be

removed only after knee braces have been installed to support each middle beam.


11.

NOTE: Hinged baseplates should be used only on middle beams supplied as “extensions” and not as

a component of an end module. End module plates should all be fixed, and end module eave

connections should be rigid, slip joints. Use of hinged baseplates in the end module could cause the

end module to collapse during installation.

12.

When using ladders to make peak connections, be sure the ladder is tall enough that workers can

reach the peak from a ladder step consistent with the safety recommendations for the ladder being

used.

13.

For any NAVI-TRAC of 100 ft or more in length, the uprights and rafters of one middle bay must be

cross-cabled on both sides in an “X” fashion for each 100 ft. of length (see illustration on page 18.)

14.

For proper loading and anchoring information, consult the appropriate NAVI-TRAC blueprint available

from Anchor Industries Inc.

15.

Before installing fabric, verify that all hip pins are properly seated into weldment fittings and

secured by lanyard pins.

16.

The installation method described herein requires coordination of tasks between workers. A

safe installation is dependent on alertness and coordination.

Advertising