Parts illustrations – Anchor CENTURY 100 & 120 WIDE User Manual

Page 2

Advertising
background image

2

Pole Cap

Top Weldment

1/2” x 8” Hex Head
Cap Screw with
washer and nut.

Top Pole Extrusion

Bottom Pole
Extrusion

Splice
Tube

1/2” x 8” Hex Head
Cap Screws with
washers and nuts for
attachment of splice.

(4) 1” x 30” Double
Head Stakes

1” x 10” Hex Head
Cap Screw with
washer and nut.

Base
Plate

Standard 7” Fluted Center Pole

Assembly

Pole Cap Fabric

Top Weldment

1/2” x 7 1/2” Hex
Head Cap Screw
with nut.

2 Pc. Center Pole

(4) 3/4”
Shackles

(4) 1” x 30” Double
Head Stakes

1” x 10” Hex Head
Cap Screw with
lock washer and
nut.

Pole Cap Frame

Base
Plate

Optional 8” Center Pole Assembly

MANPOWER REQUIRED

Six experienced installers should be able to
assemble a 100’ x 100’ tent in approximately
six hours.

TOOLS REQUIRED

Sledge Hammers
Stake Driver
2 Measuring Tapes
Front End Loader

INSPECT SITE

Caution:

Consult your local utility locator service or the
National Utility Locating Contractors Association
(NULCA) prior to installation.

Prior to actual tent

assembly, be sure to look up, down, above &
below for obstacles, pipes, wires, trouble, etc.

LAYOUT & CHECK

Utilize parts list for a quick I.D. and a check list to
ensure that you have all the parts.

Side Pole

IMPORTANT:

The installation of this Century Tent should be performed/supervised by knowledgeable tent installers with a clear
understanding of safety issues as well as the methods of anchoring. The requirements as specified with blue print
(supplied by Anchor Industries Inc.) must be followed. The installer/owner must read the assembly instructions com-
pletely prior to any installation. Particular attention must be given to anchoring! See Caution Statement on back page
of this manual.

Parts Illustrations

Advertising