Anchor LIGHT EXPEDITIONARY SHELTER User Manual
Page 7
7
STEP 3 - Add Legs to one Side.
See Figure 3.
• Lay out the parts as shown in Figure 3a. Three (3) legs with baseplates and two (2) purlins.
• The leg has an angled cut on both ends. The labeled end goes toward the eave weldments.
• Insert the base plate weldments into the bottom of the legs and secure as shown in Figure 3b.
• Lift the top frame using the eave purlins and insert the leg onto the eave weldments. Secure with pin.
• Connect the legs together with 2 purlins. This is easiest if the purlin is pinned to the mid leg first before the end
leg is moved into alignment and pinned.
Figure 3a
Right Leg w/
bolt and eyenut.
Figure 3b
Mid Leg w/ eye-
bolt and eyenut.
Left Leg w/ bolt
and nut.
Figure 3b Parts List
ITEM
Description
20
3/8” x 3” Bolt
22
3/8” x 2 3/4” Bolt
21
Eye Nut
23
Nylock Nut
7
Base Plate Weldment
5
Right Leg
4
Mid Leg
1
Left Leg
Note: On 16’ Extension Kits, substitute
the 3” Bolt (Item 20) with EyeBolt (Item
25) because eyes will be necessary on
16’ bays for connection of cross cables.
Only the16’-0” Bay has eye
nuts for cross cables.