Anchor LIGHT EXPEDITIONARY SHELTER User Manual

Page 7

Advertising
background image

7

STEP 3 - Add Legs to one Side.

See Figure 3.

• Lay out the parts as shown in Figure 3a. Three (3) legs with baseplates and two (2) purlins.

• The leg has an angled cut on both ends. The labeled end goes toward the eave weldments.

• Insert the base plate weldments into the bottom of the legs and secure as shown in Figure 3b.

• Lift the top frame using the eave purlins and insert the leg onto the eave weldments. Secure with pin.

• Connect the legs together with 2 purlins. This is easiest if the purlin is pinned to the mid leg first before the end

leg is moved into alignment and pinned.

Figure 3a

Right Leg w/

bolt and eyenut.

Figure 3b

Mid Leg w/ eye-
bolt and eyenut.

Left Leg w/ bolt

and nut.

Figure 3b Parts List

ITEM

Description

20

3/8” x 3” Bolt

22

3/8” x 2 3/4” Bolt

21

Eye Nut

23

Nylock Nut

7

Base Plate Weldment

5

Right Leg

4

Mid Leg

1

Left Leg

Note: On 16’ Extension Kits, substitute
the 3” Bolt (Item 20) with EyeBolt (Item
25) because eyes will be necessary on
16’ bays for connection of cross cables.

Only the16’-0” Bay has eye

nuts for cross cables.

Advertising