Figure 4b Parts List

ITEM

Description

12/13 Purlin

31

Frame Lift Assembly

7

Base Plate Weldment

5

Right Leg

4

Mid Leg

1

Left Leg

Figure 4b

8

Ensure sufficient personnel are on hand to lift the side (4 minimum, 3 lifting, 1 placing legs.)

Note: For installation of frames with 8’ extension kits, (1) more per-
son and (1) more frame lift assemby is required for each bay.
For installation of frames with 16’ extension kits, (2) more persons
and (2) more frame lift assemblies are required for each bay.

STEP 4 - Add Legs to the other Side.

See Figure 4b.

Lay out the parts as the previous step. Secure the base plates to the legs with the appropriate hardware.

Assemble the Frame lift as shown in Figure 4a.

Secure the frame lifts to the eave purlin on the upper leg with the shock cord. The shock cord should be next to the leg

and the half purlin lying more or less under the purlin. See Figure 4b.

Frame Lift Assembly

31

Figure 4a