Hooking up the pump and plumbing, Add water, Step 10 – Aquascape MicroPond & MicroPondless Kits (99763, 99764, 99765 & 99769) User Manual

Page 10: Step 11, Pd/pl, Overflow installation

Advertising
background image

10

Hooking up the pump and plumbing

The MicroPondless

®

and MicroPond

®

utilize the same style pump and

plumbing fittings. Connect the

pump plumbing kit to the pump and

tighten all clamps before lowering into

the MicroSkim

®

or MicroSnorkel

Vault.

The plumbing assembly includes a

threaded union disconnect that

will allow you to remove the pump

when needed.
MicroPond

®

- The following steps are

specific to the MicroSkim

®

. Skip down if

you are hooking up the pump in a

MicroSnorkel

Vault.

• The MicroSkim

®

has two holes on ei-

ther side of the unit for the plumbing

to travel to the MicroFalls

®

. Choose

the plumbing hole that is most

convenient. The pipe simply passes

through the opening on either side

of the MicroSkim

®

.

(See fig. 29)

• The pump’s electrical cord can be set

in the slot located in the back, top

edge of the skimmer.

Fig. 30 Overflow detail

Fig. 29 Plumbing exit holes

Overflow

Exit Hole

Fill up the MicroPondless

®

or

MicroPond

®

basin with water. The

MicroPond

®

should be filled just

below the level of the overflow in the

MicroSkim

®

. The MicroPondless

®

is

typically filled to a point just below

the gravel.
Note: We recommend adding EcoSys-

tems

®

EcoStarter

to dechlorinate

and properly condition city water prior

to introducing fish to your MicroPond

®

.

See owner’s manual section for tips on

adding fish to the pond.

Add water

MicroPondless

®

- The kink-free

pipe from the MicroFalls

®

can

be trimmed to proper length and

inserted through the slot on the

side of the MicroSnorkel

Vault.

Insert the barbed fitting on the

end of the plumbing assembly into

the kink-free pipe and tighten the

clamp. The cord from the pump

can be buried just beneath the

stone and gravel and run over to

the electrical supply.

STEP 10

PD/PL

STEP 11

PD/PL

Overflow Installation

• Now install the barb fitting and

clamp included with your kit into

the bulkhead fitting. Use some of

the silicone sealant to coat the

threads of the fitting, in order to

help provide a water-tight seal.

A PVC slip fitting has also been

included in case you are using

flexible PVC pipe.

• Attach and trench a section of kink-

free pipe into place (3’ minimum).

Create a drainage area at the end

of the pipe by excavating a small

pit, roughly 16” in diameter and

at least 12” deep. Fill the pit with

excess gravel. This will allow water

in an overflow situation to flow

through the pipe and drain away

from the pond.

(See fig. 30)

• A layer of scrap underlayment

fabric, soil or sod can be added to

cover the drainage area.

Advertising