It6000-ab, Maintenance, Preventative maintenance schedule – BAND-IT IT6000-AB 3/8 Tie-Lok Tool User Manual

Page 21: 21 of 38, 3/8” tie-lok, Tool

Advertising
background image

Document # I17796 Rev F

© Copyright

BAND-IT-IDEX, Inc. 2009

All rights reserved

www.BAND-IT-IDEX.com

BAND-IT-IDEX, Inc.

A Unit of IDEX Corporation

4799 Dahlia Street Denver, CO 80216-0307 USA

P: 1-800-525-0758 F: 1-800-624-3925

21 of 38

IT6000-AB

3/8” Tie-Lok

®

Tool

Clamps

Installed

Maintenance

Item

Maintenance

Action

Every 12,500

Tension Block Assembly

Clean & Re-Lubricate

Flip Cover

Clean & Re-Lubricate

Every 25,000

Mechanical Linkage

Clean & Re-Lubricate

Tool Head

Clean & Re-Lubricate

Blade

Rotate

Knife

Replace

Front Gripper

Clean, re-lubricate, and inspect for

multiple broken teeth

Every 50,000

Blade, Blade pin, Knife

and Knife pin

Replace

Tension Block Assembly

Replace Assembly

Front Gripper

Replace gripper

Preventative Maintenance Schedule

Tool Preventative Maintenance:
The tool has some wear components that must be checked and replaced on a certain
schedule. BAND-IT has developed a Preventative Maintenance (PM) schedule to help
facilitate these requirements. If tools are experiencing difficulties during function or there
audible air leaks coming from inside the handle, the tool should be returned to BAND-IT-
IDEX, Inc. for servicing.

BAND-IT recommends that the tool be sent in for general overhaul every 100,000 clamps
installed.

Maintenance

Advertising