BASELINE Lift BL412 User Manual

Page 11

Advertising
background image

11

12. Powerpack Installation

:

Install hydraulic powerpack to mounting bracket on “front-left”

post. Remove shipping plug. Run the hydraulic hose (which is already connected to the
cylinder) to the powerpack using hose clamps already installed on the runways,

crossbeams, and posts. Connect hose to hydraulic powerpack.

13. Open the hydraulic oil tank and add hydraulic oil (ISO 32). Close tank when filled. Oil

cannot be shipped with the lift and must be provided by the installer. Put the black
breather cap on top of the tank.

14. Electrical Hookup: This 4-Post Lift requires a dedicated 220V, 1ph, 20A (for 60Hz motor)

wired to local electrical codes. See diagram 6.

15. Anchoring the Posts: Before proceed, read page 14 to understand anchor bolts

installation. Verify that all posts are located in the positions previously measured. Make
sure the bases of each post are square.

16. Using the post base as a template, drill the 16 holes to a depth of 4¾" (120mm) using an

impact drill and 5/8" (16mm) concrete drill bit. After drilling, be sure that all holes are
clear of debris.

Advertising