Bedrug bedliner installation instructions – Bedrug BED LINERS: BedRug User Manual

Page 2

Advertising
background image

BedRug Bedliner Installation Instructions

Procedure

BRINST Rev. Level: 15 12/4/2009 Page 2 of 6





This document covers such items as:

• Vehicle Preparation (use of cleaners, adhesive promoters, etc.).

• Safety (rechecking torque procedure, etc.).

• BedRug installation.


1. Check Kit Content.

(a) Verify that the kit contains all the parts listed in the

Kit Contents.

2. Vehicle Preparation.

(a) Wash and Dry the Bed and Tailgate areas thoroughly.

(b) IMPORTANT: Review all instructions before

beginning installation. Truck bed should be at least

68°F (20°C) for maximum adhesion. Clean all areas

with an approved cleaner before applying tape. Do not

remove backing from any tape until ready to adhere to

the truck bed. When removing backing, do not touch

adhesive. Extra adhesive strips have been provided in

the kit for future use or if the installer deems more

fasteners are necessary for better fit/appearance.

3. Pre-assemble BedRug.

(a) Align the sides of the BedRug as shown. NOTE:

BEDRUG FLOOR IS FACE DOWN FOR THIS

OPERATION. (Fig 3-1)

(b) Once properly aligned, zip sides into place. (Fig 3-2)

4. Pre-fitting BedRug.

(a) Before preceeding with installation, verify whether or

not the bed of the vehicle has a bedrail cargo

management system installed.

(b) If a bedrail is present, trim off sections in the corners

of the bulkhead. (Fig. 4-2) If not, proceed with step 5.

Fig 4-2

Fig. 3-1

Fig. 3-2

Utility Knife

Advertising