Preparing the stove for installation – New Buck Corporation 74 User Manual

Page 13

Advertising
background image

SECTION IV

RESIDENTIAL FREESTANDING

INSTALLATION

Select an installation location that will give the best airflow from the front of the

heater to the remainder of the home.

PREPARING THE STOVE FOR INSTALLATION

1. Inspect the unit for any obvious physical damage.

2. Plug the power cord into a 115V AC outlet to test the motor and fan when optional motor is

being used. “Do not run power cord under unit or in high traffic areas”.

3. Check the primary air draft control to ensure that it slides freely.

4. Remove any items from within the firebox. Spread a dropcloth on the floor behind the

heater. Next, tilt the heater so that the back is on the drop cloth.

5. If leg kit is to be used follow steps 1-4.

6. Then obtain four legs, attach the legs to holes in bottom of unit with bolts and washers
supplied with the leg kit. (See Figure 4.)

7. If pedestal kit is being used,(and out side air is required See Page 25) open the

corresponding freestanding kit and obtain the stand. Place the stand against the bottom of

the heater (angle side to heater).Center stand front to rear ,and also center the stand left
and right ,and mark screw locations on bottom of the stove through outer holes of stand
mounting angles. Set stand aside and drill four 7/32" holes in heater bottom.Then mount
stand to bottom of heater with screws provided. (See Figure 4A.)


8. Obtain four (4) 3/16" self-tapping screws and secure the stand to the heater.

9. Reposition the heater to the upright position.


















Figure 4 Figure 4A

11