Blower installation and placement, Figure 9, Figure 10 – Clarus Environmental Fusion Series Treatment Systems 2800/3200/3600/4000 User Manual

Page 8: Warning

Advertising
background image

8

© Copyright 2013. All rights reserved.

Figure 9

1. This product must be connected to a grounded, metallic,

permanent wiring system, or an equipment-grounding terminal

or lead on the product.

2. Place the blower where it is easily accessible for maintenance

and inspection.

3. Install the blower in an area where it will be protected from

damage and flooding. Also make certain the location has good

ventilation. DO NOT place the blower below water level as back-

siphoning can occur.

4. Install the blower on a foundation that is level and solid.
5. Excavate trench for air line from blower to the switching valve,

and trench for air lines from switching valve to Fusion

®

unit.

6. Install one 1" (25.4 mm) air line from the blower to the switching

valve. Piping should be less than 17' (5 m) from blower to

Fusion

®

unit. The recirculation line is ¾" (19 mm) and the

backwash line is 1" (25.4 mm).

7. The blower is provided with one discharge port. Install the

included air line PVC tees in the backwash and recirculation

lines.

8. Attach the small diameter black air tubing (included in the blower

box) to barbed fitting on PVC tee. Black air tubing and blower

cord should be routed to the control panel through conduit.

Attach the black air tubing line to the air pressure sensor barbed

fittings in the panel. (Figure 10) If air tubing is not connected to

backwash and recirculation lines, the panel will alarm.

9. Connect the remaining end of the PVC tee to the airline installed

in Step 6.

10. The switching valve is 100V and must be connected to the panel

through the use of the supplied transformer. See included

transformer installation instructions.

BLOWER INSTALLATION AND PLACEMENT

Figure 10

SK2930

SK2955

WARNING!

CLEANOUT

SEWER

ALARM FLOAT CONDUIT

INSTALLED BY CONTRACTOR

WHERE APPLICABLE

CLARUS FUSION

ALARM PANEL

BLOWER

SWITCH BOX

RISER AND LID

AIR LINES TO

TREATMENT UNIT

TO DISPERSAL

W.L

W.L

W.L

OPTIONAL SEPTIC TANK INSTALLATION

MAY BE REQUIRED BY

LOCAL OR STATE REGULATIONS

BACKWASH HOSE

SUPPLIED

(RED CONNECTION)

SWITCH BOX

AERATION HOSE

SUPPLIED

(BLUE CONNECTION)

MOUNTING BRACKET

CLAMP

BLOWER HOSE

SUPPLIED

ZFL TREATMENT UNIT

POWER CORD

AIR LINE SENSOR FITTING

RED CONNECTION

BACKWASH

BLUE CONNECTION

AERATION

Advertising