Elkhart Brass Sidewinder Typical Pumper Truck Install Guide User Manual

Monitor nozzle, Typical pumper truck install guide

Advertising
background image

Typical Pumper Truck Install Guide:

Monitor & Nozzle

MONITOR

NOZZLE

1

1.

2.

A. Tighten Sidewinder EXM monitor to

base using Loctite 592 thread sealant or

equivalent.

B. Add a 20A(12VDC)* fuse between

RED controller lead and positive power

lead.

NOTE: We recommend using 16 AWG for monitor power and ground. See

Sidewinder EXM monitor installation guide on page 9 of the manual for

length to gauge recommendations.

A. Position monitor discharge elbow

parallel to ground. Ensure gasket is

inside nozzle swivel.

B. Hand tighten nozzle to monitor using

swivel end piece.

C. Adjust flow by pressing down on

locking lever and rotating nozzle to

desired flow setting.

*10A(24VDC)

D. Confirm that locking lever is snapped

securely into position.

E. Loosen swivel and reposition nozzle

so the locking lever is on the very

bottom; 6 o’clock position.

F. Tighten swivel using a spanner

wrench to ensure a secure connection.

G. Connect nozzle and monitor two-way

connectors.

3.

Confirm that all connections are tight and all electrical connections have been reconnected. If installing additional components,

such as controllers, you may choose to double check the connections after everything has been installed.

90°

16g

98326020 Rev. Rel

Advertising