Enerpac BPR-Series User Manual

Page 6

Advertising
background image

6

4.1 Installing the Lifting Jack (Figure 12)

1.

On 50 and 100 ton units, attach one of the small angle
brackets to the top right frame spacer (E) using two

5

8

-11 X 1

1

2

" long capscrews,

5

8

" lockwashers and nuts.

2.

For all models, grasp the jack plunger (F) and pull it all the
way down through the hole in the mounting bracket (G).

3.

Position the lifting jack on the mounting bracket (G).
The coupler (H) must face outward. Use two

1

4

-20 X 3"

bolts, lockwashers and nuts (I) to secure the jack to the
mounting bracket (G).

4.2 Installing the P-51 Hand Pump (Figure 13)

1.

Install the other small angle bracket on the frame
spacer mid-way up the right side of the frame. Use two

5

8

-11 X 1

1

2

" long capscrews, lockwashers and nuts.

2.

Position the P-51 hand pump on the angle bracket (J),
with the handle opening facing left. Mount the pump to
the bracket using four

1

4

-20 X 1

1

4

" long capscrews,

lockwashers and nuts (K).

3.

Remove the shipping plug from the top of the P-51
pump reservoir. Install the unpainted vent plug (L).

4.

Remove the shipping plug from the lower front pump
outlet port. Install the 90° elbow (M), provided, into the
outlet, facing upward. Attach the 6 ft. long

1

4

" I.D.

hydraulic hose (N) from the pump elbow to the lifting
jack coupler. Tighten the coupler.

Figure 12

E

F

G

H

I

Figure 13

J

K

L

M

N

P-462, P-464 and some Air and Electric Pumps

Most Electric Pumps

P-80, P-84, P-391 and P-392 Hand Pumps

Submerged Pumps

PUJ1200B Electric Pump

1

2

3

5

6

7

1

2

4

5

6

7

7

2

3

4

5

6

1

2

8

9

7

6

7

2

4

5

6

1

Figure 14

Advertising