Englert IMP Englert Combined User Manual

Page 7

Advertising
background image

SUBJECT TO CHANGE WITHOUT NOTICE

6

G

ENERAL

I

NSTALLATION

S

EQUENCE

1. Install and caulk the appropriate flashing/trims.
2. Measure and cut the first panel

3. Place and plumb the first panel
4. Through-fasten the cut edge.

5. Install clips and fasteners along the factory edge of the panel at the girt locations.
6. Apply sealant pigtails.

7. Field-caulk the second panel.
8. Place and engage the second panel.

9. Install clips and fasteners along the factory edge of the panel at the girt locations.
10. Continue

Advertising